Dry goods share, a minute to take you to understand aluminum scaffolding


Release Time:

2021-09-15

The overall structure of aluminum alloy scaffold adopts "building block" combination design, with standardized parts and no loose parts. Without any installation tools, two workers can build a 20-meter high working platform in a short time. The components are light in weight and easy to install, handle and store. The scaffold WEIGHS only 1/3 as much as the traditional steel scaffold. There is no need to worry about crushing the ground.

The overall structure of aluminum alloy scaffold adopts "building block" combination design, with standardized parts and no loose parts. Without any installation tools, two workers can build a 20-meter high working platform in a short time. The components are light in weight and easy to install, handle and store. The scaffold WEIGHS only 1/3 as much as the traditional steel scaffold. There is no need to worry about crushing the ground.

What is aluminum scaffolding like?

1. Aluminum alloy scaffold parts are light in weight, easy to install, transport and storage. Aluminum scaffolding weighs only a third as much as traditional steel scaffolding, so there's no need to worry about laying the base.

2. Parts connection strength, stability, support mechanism design is scientific, the overall structure is safe and stable.

3. The destructive power of aluminum alloy scaffold joint is 4100 -- 4400 kg, which is much larger than 2100 kg. The maximum load of 12 meters high double-width lathe is 500 kg.

4. The overall structure of aluminum alloy scaffold adopts "Brick" combination design, with standardized parts and components and no products.

5. Aluminum scaffold does not need installation tools, two workers can build a 20-meter-high working platform in a short time.

What should be paid attention to in aluminum scaffold?

1. Before installing scaffolds, take out the positioning cables of the scaffolds and place the bases and supports correctly according to the designed dimensions. Bamboo and wood scaffoldings should be buried on the ground. It is strictly forbidden to install landing labels on the white pens.

2. The vertical rod should be vertically and stably placed on the metal bracket or liner, and the vertical rod and vertical horizontal rod joints should be staggered. The connection of steel pipe scaffold must be connected with fasteners, tighten the bolts, and prohibit binding with other materials.

3. The materials for installing scaffolds should be the same. Mixing steel, wood, bamboo and other materials is strictly prohibited. Scaffolds MUST BE INSTALLED ACCORDING to the construction schedule AND SHALL NOT EXCEED TWO STAGES on adjacent cloSETS at a time.

4. At the beginning of pole installation, install a support every 6 times and remove it according to the situation before the wall is firmly installed. When you land at a walled rescue point, you install a vertical, vertical, and horizontal bar there, and then immediately install a ledge.

5. The height of the single and double springboards below 24 meters should be respectively installed on both ends of the external facade scissors support, the width of the scissors support is not less than 4, not more than 6 spans, not less than 6 meters, the inclination Angle of the inclined plane rod and the ground should be between 45~ 60, continuous setting from the bottom to the top. Double ROW SCAFFOLDS GREATER THAN 24 M IN HEIGHT MUST BE CONTINUOUSLY SHEARS SUPPORTED OUTWARDS THROUGHOUT THEIR LENGTH AND HEIGHT.

6. The width of the road surface on the ramp must be greater than 1.5m and the slope must be 1:6. The width of the crosswalk must not be less than 1m and the slope must be l: 3. The corner must be set with a platform, and the width cannot be less than the width of the ramp. Stu porridge or wooden footstool should be installed every 250 to 300mm, the thickness of the non-slip wood should be 20 to 30mm.

7. Work layer scaffold should be spread, spread, 120 ~ 150 mm away from the wall, no gap and probe plate. When using stamped steel foot board, wooden foot board, bamboo foot board, should be installed on the three horizontal rods. If the sole length is less than 2 meters, two horizontal poles can be used for support, but the ends of the sole should be stable to prevent tilt. When using the bamboo foot handplate, the vertical and horizontal bars should not be larger than 400mm, and the spacing should be equal.

8. When stamping steel footstool, wooden footstool and bamboo rope footstool overlap, the overlap length is 200mm. Two horizontal bars must be installed for docking. The spacing between the two horizontal bars must not exceed 200mm. Cross the footstool at the corner of the shelf so that it overlaps. The soles of the feet should be paved, with wooden blocks, firmly fixed, not brick shop. The main bamboo bars should be placed perpendicular to the vertical horizontal bar direction, using butt tiling, the four corners of the application of 14 galvanized steel wire fixed on the vertical horizontal bar.

 

News Bulletin

Wechat Official Account:

图片名称

Zhuhai Extreme Aerial Working Equipment Co..ltd

Tel: 0756-3316847/4006-087-086
Phone: 13697777117
Fax: 0756-3610038
Email address: jilimc@163.com
Address: Building 2, Jishan Industrial Zone, Tangjiawan Town, Xiangzhou District, Zhuhai City


copyright © 2022 Zhuhai Extreme Aerial Working Equipment Co..ltd